Section 3.5 sets an initial term of three years with two one year options. The shape below puts the counting and the three decisions first, so the City approves a migration against real numbers instead of an estimate.

Phasing ECI proposes for a three year initial term
PhaseWhenNameWhat happensDeliverable
Phase 1Weeks 1 to 4Census and decisionsCount what the systems above actually hold: lists, preferences, surveys, projects, documents. Settle the three decisions that change everything after them: whether PublicInput is replaced, which of the two monitoring products is the City's record, and who owns the subscription lists.Written inventory with counts, and the three decisions recorded.
Phase 2Weeks 4 to 8Configure, do not customizeStand up the platform against the requirements matrix, configured rather than coded, per section 3.8. Identity against the City's directory first, because every later step depends on who can sign in.Configured environment, single sign on working, roles defined.
Phase 3Weeks 8 to 14One department, end to endMigrate one department with a live engagement project, including its contacts, preferences, surveys and history. Accessibility validated against WCAG 2.1 Level AA before anyone else is onboarded.One department live, with the accessibility evidence and the migration method proven.
Phase 4Months 4 to 12Phased adoptionDepartment by department, at the pace the City sets. Training on site, per section 3.13, with train the trainer so the City is not dependent on the vendor in year two.Departments live, trainers certified, decommissioning list for what is replaced.
Phase 5Years 2 and 3Operate and consolidateRetire what the platform replaced. A system left running is a system still being paid for.Annual report on what was retired and what it saved.

Why one department goes live before the rest

The City's own guidance in this RFP is phased adoption where applicable. ECI would go further and insist on it. One department taken end to end, including its contacts, its preferences, its surveys and its history, proves the migration method on real data while the cost of being wrong is still one department. Onboarding eleven departments in parallel on an unproven method is how these projects produce a platform nobody trusts.

Accessibility is validated in that same phase and not at the end. Section 3.10 sets WCAG 2.1 Level AA across all digital components, and a platform that fails it is cheaper to find out about with one department live than with all of them.

What ECI would ask of the City

A named City contact who can answer scope questions inside two business days, the three decisions in phase 1 made on the City's own schedule, and access to the current systems' exports. Training is on site in City facilities per section 3.13, so room and staff scheduling is a joint exercise rather than a vendor assumption.