What has to move
Section 4.1.3.10 asks for a migration approach, and section 5.4 scores it. The honest starting position is that the quantity of every item below is unknown from outside the City, and ECI would rather say so here than put a number in a bid that it cannot stand behind.
| Item | Count as at 24 November 2026 | What it is | Where it goes wrong |
|---|---|---|---|
| Contacts | Unknown | Names, addresses and channel. The easy part. | Deduplication across departments is the work. The same resident is in several lists. |
| Communication preferences | Unknown | Which lists, which channels, which language, and consent. | A preference that cannot be proven has to be treated as withdrawn. Lose these and the City is re subscribing residents who already said what they wanted. |
| Surveys and their responses | Unknown | Instruments, and the answers already collected. | Responses are public records. They move, or the City keeps the old system running to hold them. |
| Engagement data | Unknown | Participation records tied to projects and phases. | Rarely exportable in a usable shape. Expect to rebuild the structure and carry the facts. |
| Content | 422 documents found from 150 of 3,146 pages | Project pages, documents, images and the text around them. | A tenth of the estate was sampled. The real figure is several thousand documents, and every one of them is subject to section 3.10. |
| Project information and history | Unknown | Which projects ran, who was consulted, what was decided. | The part the City will miss most in year two, and the part most often dropped to hit a date. |
Communication preferences are the item to protect
Contacts can be reloaded from a list. Content can be recreated from the old site. A communication preference cannot be reconstructed, because it is a statement a resident made and nobody else can make it for them. If the export does not carry the channel, the language and the consent together, the City is left either re subscribing people who already chose, or dropping people who wanted to hear from it.
ECI treats preferences as the first thing to export from the current systems and the first thing verified after loading, against a sample the City picks. That order is deliberate: if the preferences cannot be moved cleanly, the City should know in week two and not in month six.
Open questions
- Which product is the City's record of accessibility conformance, Monsido or Siteimprove? Both load on every templated page read.
- Is the engagement platform already in use by at least one department in scope for replacement, or does it stay alongside?
- Where do the subscription lists and communication preferences live today, and how many are there? No bulk communications vendor is visible in the public pages.
- Does the City's existing Granicus agreement already include engagement or subscription modules? The City may be buying something it part owns.
- Will authentication be against the City's own directory for City staff, and what is expected for residents who participate?
- Is the forms product in scope, given that scope item C asks for surveys and feedback?
These are the questions ECI would put to the City at the pre proposal conference on 3 December 2026 and through the Procurement Portal, rather than assume answers to them.