Evidence
Every number on this site is reproducible, and the City is entitled to the method and its limits before weighing any of them.
| Item | Detail |
|---|---|
| Date | 24 November 2026. |
| Source | The City's own published sitemap and the pages listed in it. No City system was accessed, no credential was used, and nothing was requested that a resident could not request. |
| Rate | Requests were spaced so the reading placed no meaningful load on City servers. |
| Sitemap | 3,146 page addresses. |
| Pages read for system references | 150, taken at an even interval across the sitemap rather than from one section. |
| Fully templated pages | 48 of the 150 carried the complete City page template. The vendor scripts counted on this site were counted against those pages, not against all 150. |
| Pages read for vendor keywords | 240, a separate even interval sample, searched for every common bulk email, survey and engagement vendor name. 62 of them carried the full City template, and the two monitoring products appear on all 62. |
| Vendors searched for and not found | Sixteen common bulk email, survey, engagement and accessibility overlay products were searched for by name across those 240 pages. None appears. The names searched are listed in the seed file held with this example. |
| What was recorded | Every reference in the page markup to a host outside charlottenc.gov, from script, image, link, frame and form attributes, plus every link to a document file. |
| Not executed | No page script was run for analysis and no fetched file was opened in an application. Markup was read as text. |
| Known limits | A sample is a sample. Systems behind a login, systems a department runs without linking to, and anything reached only from the 2,996 pages not read are absent from these figures. The absence of a vendor name is evidence that it is not referenced in public markup, not evidence that the City does not use it. |
What is ECI judgment rather than measurement
The verdict column on the inventory page, the four overlaps, the phasing, the migration risks and the open questions are ECI's reading of what the measurements mean. They are labeled as judgment because that is what they are. The counts are measurements. The two are kept apart on purpose, and the City should press any bidder, including ECI, on which is which.
A note on the due date
The solicitation letter in the RFP states proposals are due 22 December 2026 at 5:00 p.m. Anywhere a different date appears, the solicitation governs and ECI works to the earlier of the two.